My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/11/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
06/11/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 10:11:03 AM
Creation date
6/5/2025 10:10:56 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/11/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br />To:Katie Larsen, Lino Lakes City Planner <br />From:Kelsey Gelhar PE, WSB <br />Diane Hankee PE, Lino Lakes City Engineer <br />Date:January 4, 2023 <br />Re:Phelps Road StockpileIUP <br />Plan Review <br />WSB Project Number –021977-000 <br />WSB has reviewedthe finalplansfor the Phelps Road Stockpile projectin Lino Lakes, MN, <br />preparedby Stantec,received on December 15, 2022. These comments are based on the <br />following documents: <br />Stockpile Construction Planprepared byStantec,dated December 15, 2022,received <br />December 15, 2022. <br />ALTA/NPS Land Title Survey prepared byLandform, dated December 17, 2021, received <br />December 15, 2022. <br />Regulated Wetlands and Tributaries exhibit prepared by Kjolhaug Environmental <br />Services Company, received December 15, 2022. <br />Applicant to respond to these comments in writingon this word document. Any changes to the <br />plans that are not associated with these comments shall be identified by either a summary in the <br />response or in the plans with a revision cloud or note. <br />Engineering <br />•General <br />The Phelps Road Stockpileprojectproposesto stockpile soilon the parcellocatedat the <br />west end of Phelps Road. The applicant stated that the intent is to bring in sufficient fill to <br />prepare for future industrial development on the site.The sitewill be accessed from Phelps <br />Roadand is adjacent to I-35E. The parcel being utilized for thethree proposedstockpiles is <br />approximately 14.39acres. <br />The proposed stockpileswill be approximately 4.81acres intotalarea, will not exceed a <br />height of 15feet, and be a total of approximately 71,000cubic yards of fill soilbased on the <br />plans. <br />Comments: <br />1.A geotechnical report and a traffic study will be required for any future <br />development of buildings, utilities, etc. <br />•Grading, Erosion Control& Stormwater Management <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.