My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-27-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
05-27-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:08:28 AM
Creation date
6/12/2025 9:22:19 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/27/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />5/7/2025 <br />Page 2 <br />• Water Supply <br />A specific utility plan was not provided with the final plat however the master plan from <br />the preliminary plat showed the existing 8" watermain stub on 701h Street that would be <br />utilized by the proposed Aldi site. There were no additional utilities proposed outside the <br />scope of the Aldi project. A future watermain stub will need to be provided to the south <br />currently beyond the temporary cul de sac that will ultimately loop to both Otter Lake <br />Road and The Otter Lake Service Road in the southwest corner of the site. <br />Comments: <br />1. Future easement will be required in favor of the restaurant site for utilities from the <br />Otter Lake Service Road or the restaurant service stubs should be shifted to the <br />access road as part of the Aldi plan/construction <br />Sanitary Sewer <br />A specific utility plan was not provided with the final plat however the master plan from <br />the preliminary plat showed the existing 8" sanitary stub on 70th Street that would be <br />utilized by the proposed Aldi site. There were no additional utilities proposed outside the <br />scope of the Aldi project. A future sanitary sewer stub will need to be provided to the <br />south currently beyond the temporary cul de sac that will ultimately serve the remaining <br />outlot area to the southwest. <br />Comments: <br />2. Future easement will be required in favor of the restaurant site for utilities from the <br />Otter Lake Service Road or the restaurant service stubs should be shifted to the <br />access road as part of the Aldi plan/construction <br />• Transportation <br />The current Otter Crossing South development proposes utilizing and extending the <br />existing accesses from Main Street/ CSAH 14 and Otter Lake Road/ CR84. A revised <br />traffic study and analysis was conducted for the overall development and redline <br />comments were provided for the submitted study (attached). <br />Comments: <br />3. Queueing analysis results are requested for proposed frontage road and 701h Street <br />intersection. Surrounding accesses should be spaced and meet any requirements of <br />that analysis. � <br />4. The to to perary na r�rAl inndrF.ulrve sad' should be shim to the south Ion of the <br />frentAge read and 70-t4 Street interse..tien <br />5. Ghost platting on the north side should reduce accesses to Otter Lake Service Road <br />to one access lined up as shown or remove all accesses for future development <br />6. (WSB 5/7/2025) See signing and striping redline comments on the Turn Lane <br />Construction Plan. <br />Otter Lake South — Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.