Laserfiche WebLink
90o 894• <br />r <br />1 I _ <br />)J <br />..:.� <br />s "= <br />Proposed Storm Sewer <br />Existing Storm Sewer <br />�! = Existing CB <br />�' _ !- • Existing MH <br />Existing FES <br />rrs. <br />994 Wetland Basin <br />► w < <br />tiTIQ�'O Birch St BMP <br />Parcels <br />Contours <br />This concept is based around a realignment of the ditch channel to resemble a loft <br />natural stream. Basins around the stream would fill via one way inlet when water <br />levels rise and draw down via evapotranspiration. 4oz y , 2 ft <br />BMP Map - Concept 3 <br />Shenandoah Drainage Study 0 150 \ ^ �C <br />LNG KES City of Lino Lakes Feet V V J <br />1 mch = 150 feet <br />Shenandoah Improvements Feasibility Report <br />City of Lino Lakes, MN <br />WSB Project No. 018901-000 <br />Page 14 <br />