My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-27-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
05-27-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:08:28 AM
Creation date
6/12/2025 9:22:19 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/27/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wsb <br />April 24, 2025 <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal for Winters Wetland Bank Mitigation Banking Instrument/Full <br />Bank Plan and Wetland Bank Construction <br />Dear Mr. Grochala: <br />2 WSB is providing this proposal to complete a Mitigation Banking Instrument (MBI) and <br />° full wetland bank plan for the Winters Wetland Bank Site, based on the draft prospectus <br />and prospectus previously submitted by WSB to local, state, and federal agencies for <br />Z <br />Ui review and comment. This proposal also includes an estimate for wetland bank <br />construction. These two projects are shown separately below. Required tasks for the <br />MBI/Full Bank Plan include: <br />0 <br />0 <br />co <br />1. Project management <br />M 2. <br />Conservation Easement/Title Review/Exhibit <br />3. <br />Development of vegetation management/monitoring plan and performance <br />— <br />standards <br />4. <br />Hydrology Monitoring (if required) and development of hydrology monitoring plan <br />LO <br />and performance standards <br />— 5. <br />CAD Plans (100%) and project manual <br />6. <br />Engineer's Estimate <br />U) 7. <br />MBI Report and Bank Plan submittal <br />0 8. <br />TEP/IRT Meetings <br />w 9. <br />Address TEP/IRT Comments <br />Z 10. <br />Level 2 wetland delineation <br />11. Bidding Documents and Administration <br />Required tasks for Wetland Bank Construction include: <br />w <br />Z) 12. Project Management <br />U) 13. Preconstruction Meeting <br />U) 14. Construction Administration <br />Z) 15. Construction Staking <br />w 16. Construction Observation <br />'a 17. As -built Survey and Project Closeout <br />Z 18. 15% Credit Release <br />w <br />x <br />0 <br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\Winter Wetland <br />Bank_2020\Staff Reports\20250512 CC Authorize MBI\a2, WSB_WintersWetland Ban k_MBI_042425.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.