My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-09-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-09-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 9:46:34 AM
Creation date
6/12/2025 9:41:53 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/09/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 7F <br />STAFF ORIGINATOR:Diane Hankee, PE, City Engineer <br />MEETING DATE:June 9, 2025 <br />TOPIC:Consider Resolution No. 25-85, Accepting Quote for Test Well No. <br />7B Grading <br />VOTE REQUIRED:Simple Majority <br />______________________________________________________________________________ <br />INTRODUCTION <br />Staff is requesting authorization to accept quotes and award the construction contract for the <br />Test Well No. 7B Grading located at the Water Treatment Plant site. <br />BACKGROUND <br />On November 4, 2025 the City authorized the design and analysis of a test well in preparation <br />for the Well No. 7B permit application, see enclosed map. Prior to drilling the new production <br />well, the city is required to drill a test well. <br />On May 27, 2025 the City accepted quotes and awarded the construction contract for Test Well <br />No. 7B to Traut Companies, who will use sonic drilling to mitigate sandstone fracture failures. <br />The proposed new Well No. 7B would replace existing well No. 2 which has not been in service <br />due to poor water quality. The new test well and production well would be located at the <br />Water Treatment Plant site, eliminating the need for a pumphouse and reducing the length of <br />raw watermain needed to connect the well to the treatment plant. <br />The City requested quotes from three contractors to complete the grading work needed to <br />build up the test well site. The City may have some additional electrical costs along with <br />grading. The quotes for the project were received on June 3, 2025 and are outlined below: <br />CONTRACTOR QUOTE <br />Arndt Construction, Inc.$48,520.00 <br />Park Construction Co.$117,283.84 <br />R.L. Larson Excavating, Inc.Did Not Quote <br />Page 341 of 353
The URL can be used to link to this page
Your browser does not support the video tag.