Laserfiche WebLink
2 <br />0 <br />U <br />0 <br />Z <br />w <br />m <br />0 <br />a <br />CO <br />00 <br />00 <br />U) <br />0 <br />Z <br />a <br />a <br />Z <br />a <br />CO <br />0 <br />0 <br />N <br />W <br />F- <br />LU <br />W <br />X <br />F- <br />U) <br />TZ <br />- <br />0) <br />W <br />00 <br />wsb <br />Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From: Kelsey Gelhar PE, WSB <br />Diane Hankee PE, Lino Lakes City Engineer <br />Date: January 4, 2023 <br />Re: Phelps Road Stockpile IUP <br />Plan Review <br />WSB Project Number — 021977-000 <br />WSB has reviewed the final plans for the Phelps Road Stockpile project in Lino Lakes, MN, <br />prepared by Stantec, received on December 15, 2022. These comments are based on the <br />following documents: <br />Stockpile Construction Plan prepared by Stantec, dated December 15, 2022, received <br />December 15, 2022. <br />ALTA/NPS Land Title Survey prepared by Landform, dated December 17, 2021, received <br />December 15, 2022. <br />Regulated Wetlands and Tributaries exhibit prepared by Kjolhaug Environmental <br />Services Company, received December 15, 2022. <br />Applicant to respond to these comments in writing on this word document. Any changes to the <br />plans that are not associated with these comments shall be identified by either a summary in the <br />response or in the plans with a revision cloud or note. <br />Engineering <br />• General <br />The Phelps Road Stockpile project proposes to stockpile soil on the parcel located at the <br />west end of Phelps Road. The applicant stated that the intent is to bring in sufficient fill to <br />prepare for future industrial development on the site. The site will be accessed from Phelps <br />Road and is adjacent to 1-35E. The parcel being utilized for the three proposed stockpiles is <br />approximately 14.39 acres. <br />The proposed stockpiles will be approximately 4.81 acres in total area, will not exceed a <br />height of 15 feet, and be a total of approximately 71,000 cubic yards of fill soil based on the <br />plans. <br />Comments: <br />1. A geotechnical report and a traffic study will be required for any future <br />development of buildings, utilities, etc. <br />• Grading, Erosion Control & Stormwater Management <br />Page 103 of 142 <br />