My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-23-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-23-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 9:40:34 AM
Creation date
7/1/2025 9:33:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/23/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />0 <br />U <br />0 <br />Z <br />w <br />m <br />0 <br />a <br />CO <br />00 <br />00 <br />U) <br />0 <br />Z <br />a <br />a <br />Z <br />a <br />CO <br />0 <br />0 <br />N <br />W <br />F- <br />LU <br />W <br />X <br />F- <br />U) <br />TZ <br />- <br />0) <br />W <br />00 <br />wsb <br />Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From: Kelsey Gelhar PE, WSB <br />Diane Hankee PE, Lino Lakes City Engineer <br />Date: January 4, 2023 <br />Re: Phelps Road Stockpile IUP <br />Plan Review <br />WSB Project Number — 021977-000 <br />WSB has reviewed the final plans for the Phelps Road Stockpile project in Lino Lakes, MN, <br />prepared by Stantec, received on December 15, 2022. These comments are based on the <br />following documents: <br />Stockpile Construction Plan prepared by Stantec, dated December 15, 2022, received <br />December 15, 2022. <br />ALTA/NPS Land Title Survey prepared by Landform, dated December 17, 2021, received <br />December 15, 2022. <br />Regulated Wetlands and Tributaries exhibit prepared by Kjolhaug Environmental <br />Services Company, received December 15, 2022. <br />Applicant to respond to these comments in writing on this word document. Any changes to the <br />plans that are not associated with these comments shall be identified by either a summary in the <br />response or in the plans with a revision cloud or note. <br />Engineering <br />• General <br />The Phelps Road Stockpile project proposes to stockpile soil on the parcel located at the <br />west end of Phelps Road. The applicant stated that the intent is to bring in sufficient fill to <br />prepare for future industrial development on the site. The site will be accessed from Phelps <br />Road and is adjacent to 1-35E. The parcel being utilized for the three proposed stockpiles is <br />approximately 14.39 acres. <br />The proposed stockpiles will be approximately 4.81 acres in total area, will not exceed a <br />height of 15 feet, and be a total of approximately 71,000 cubic yards of fill soil based on the <br />plans. <br />Comments: <br />1. A geotechnical report and a traffic study will be required for any future <br />development of buildings, utilities, etc. <br />• Grading, Erosion Control & Stormwater Management <br />Page 103 of 142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.