My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-23-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-23-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 9:40:34 AM
Creation date
7/1/2025 9:33:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/23/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON -SITE WORK. <br />A. On -Site Work. The On -Site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, <br />codes and ordinances of the City. The On -Site Work includes but is not <br />limited to the erosion control, material hauling, grading and compacting <br />material, and site restoration. <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be <br />reviewed by the City, and the City shall establish the actual amount of the <br />financial guarantee. The description and estimated cost of Developer's <br />On -Site Work are as follows: <br />Description of Improvements <br />Estimated Costs <br />1. <br />Lighting <br />$ 0.00 <br />2. <br />Fences / Screen Structures <br />$ 0.00 <br />3. <br />Trash Disposal Structures <br />$ 0.00 <br />4. <br />Curbing / Islands / Delineators <br />$ 0.00 <br />5 <br />Storm Drainage Systems / Sewers / Catch Basins / <br />$ 0.00 <br />Culverts / Swales <br />6. <br />Public Trails and / or Sidewalk <br />$ 0.00 <br />7. <br />Private Trails and / or Sidewalk <br />$ 0.00 <br />8. <br />Driveway / Curb cut / Parking Lot / Fire Lane <br />$ 0.00 <br />9. <br />Water mains / Hydrants / Sanitary Sewers <br />$ 0.00 <br />10. <br />Landscaping <br />$ 0.00 <br />11. <br />Site Grading <br />$ 10,000.00 <br />12. <br />Erosion Control <br />$ 9,500.00 <br />Total Estimated Cost of Developer Improvements <br />$ 19,500.00 <br />Security Requirement (Total * 35%) <br />$ 6,825.00 <br />Phelps Road Stockpile Site Performance Agreement page 2 of 10 <br />Page 115 of 142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.