My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-23-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-23-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 9:40:34 AM
Creation date
7/1/2025 9:33:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/23/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />0 <br />U <br />U <br />z <br />W <br />ca <br />U) <br />0 <br />0 <br />00 <br />LO <br />M <br />Z <br />0 <br />a <br />W <br />Z <br />Z <br />0 <br />M <br />W <br />Z) <br />U) <br />J: <br />W <br />Z) <br />Z <br />W <br />a <br />a <br />Z <br />W <br />x <br />0 <br />wsb <br />June 18, 2025 <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal to Complete 2026 Birch Street Sewer Crossing Project <br />Construction Plans and Specifications <br />Dear Mr. Grochala: <br />WSB LLC. is providing this proposal for the design and bidding services for the 2026 <br />Birch Street Sewer Crossing Project. This project includes boring or jacking a 24" casing <br />pipe and installing a 15" sanitary sewer pipe from the north side to south side of Birch <br />Street, approximately 200 feet west of the intersection of Birch Street and West Shadow <br />Lake Drive. <br />Based on the project scope, WSB would perform the following tasks: <br />I. Prepare Final Project Plans <br />Final construction plans will be prepared indicating the project locations <br />and plan view sheets for the watermain. Surveyed topographic <br />information will be used to prepare the construction plans. Base drawing <br />information will include GSOC design locates, curb inspection, city parcel <br />map information and record plans. <br />II. Final Quantities <br />An Engineer's Opinion of Probable Cost will be completed with the final <br />construction plans. <br />III. Prepare Permits, Specifications and Bidding Documents <br />WSB will assist the City in preparing permit application(s) and/or approval <br />requests and will assist the City with submitting the applications/approval <br />requests to the appropriate regulatory agencies. <br />WSB will develop the final project plans and specifications based on the <br />agency review comments. This task will include an internal <br />constructability review of the final plans, quantities, and specifications. <br />Upon completion of permitting, and agency review and approval, a final <br />set of construction documents will be prepared for electronic bidding. <br />WSB will assemble and submit the final contract documents, either paper <br />or electronic copies, to the City and request authorization to advertise the <br />project for bidding. WSB will receive and respond to bidder inquiries <br />concerning the plans, specifications, and intent of the project. Logs of all <br />Page 136 of 142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.