Laserfiche WebLink
Easements <br />Standard drainage and utility easements at least ten (10) feet wide have been provided along <br />all other lot lines and stormwater management facility. <br />Storm Water Management and Erosion and Sediment Control <br />Per the June 4, 2025 Engineering Memo, stormwater management for the Erickson Property <br />site consists of a sedimentation basin to provide treatment. Existing and proposed discharge <br />rates are summarized below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition <br />2-Year <br />10-Year <br />100-Year <br />10-Day Snowmelt <br />Only needed if <br />Existing <br />7.36 <br />15.00 <br />32.57 <br />basins landlocked <br />Currently <br />Only needed if <br />3.08 <br />6.02 <br />12.35 <br />Proposed <br />basins landlocked <br />Utilities <br />An 8" watermain and 10" sanitary sewer will service the lots. <br />Public Land Dedication <br />The City will require cash in lieu of land dedication. <br />Park Dedication Fees <br />Total # of Lots = <br />13a <br />x 2025 Park Dedication Fee <br />$3,500 <br />= Total Due <br />$45,500 <br />a The existing lot/house will not be charged a park dedication fee; therefore, only 13 lots will be <br />charged for park dedication fees. <br />Parks, Greenways and Trail Plan <br />The proposed subdivision is within the Watermark Park neighborhood service area and <br />additional land dedication is not required. The park plan identifies a trail along CSAH 54 (201n <br />Avenue). A trail currently exists along the Watermark development within the road right-of- <br />way. A trail shall be graded in along the Erickson Property to tie into the existing trail. The City <br />will install the trail at a future date. <br />Page 7 of 46 <br />