Laserfiche WebLink
MITIGATION PLAN <br /> The AUAR Mitigation Plan is outlined below. <br /> ITEM 7. CLIMATE ADAPTATION AND RESILIENCE <br /> Item No. Mitigation Description Update <br /> 7.1 Proposed climate smart tree plantings and landscaping will reduce runoff This mitigation measure is ongoing. <br /> and mitigate urban heat island effect. <br /> 7.2 Design of the site and stormwater management facilities will be completed This mitigation measure is ongoing. <br /> to reduce the risk of flooding in the AUAR study area. <br /> 7.3 Developer will consider using native plants and perennials for landscaping This mitigation measure is ongoing. <br /> and stormwater features will absorb water and reduce the water demand <br /> for irrigation. The MPCA's Updated Plants for Stormwater Design is a <br /> recommend resource for native plant selection. <br /> 7.4 Developer should consider climate adapted vegetation to mitigate impacts This mitigation measure is ongoing. <br /> of drought and large rain events. <br /> 7.5 Developer will consider chlorine management plan to minimize impacts of This mitigation measure is ongoing. <br /> increased freeze and thaw cycles on water resources <br /> ITEM 8. PERMITS AND APPROVALS REQUIRED <br /> As projects are proposed, the project proposer will be required to obtain permits and approvals. Projects proposed since the original AUAR have <br /> obtained proper approvals. Additional permits that may not be listed here may also be required. <br /> Unit of Government Type of Application Status <br /> Federal <br /> Army Corps of Engineers Section 404 Permit To be Applied for <br /> Federal Highway Administration Interchange Access Request To be Applied for <br /> State <br /> 1 Mitigation Plan Update—2025 June 16, 2025 <br /> Page 173 of 240 <br />