Laserfiche WebLink
3. Comment noted. The development scenarios <br /> represent a full build out of the corridor. The <br /> Item 6-Project Description,Forecasts(Todd Graham,651-W2-1322) City anticipates development timing consistent <br /> The AUAR Update presents two remaining alternative scenarios for planned land use and accompanying 3❑. with the 2040 forecasts. <br /> development.Scenario 1 Includes maximum levels of 4,888 housing units,5.1 million sq.fL of commercial <br /> use,12,8 million sq,ft,of industrial space Scenario 2 includes maximum levels of 7,403 housing units,5 3 <br /> million sq.R.of commercial use, 10.1 million sq.ft-of industrial space. 4. Comment noted. Items 27.3 and 27.4 have <br /> Should future development result In maximum levels of Scenarios 1 or 2,the result would substantially been added to the mitigation plan. <br /> exceed citywide forecasts for Lino Lakes.The AUAR Study Area includes the eastern half of TAZs 160 and <br /> 161(west of 1-35)and all of TAZ 162(east of 1.35).In its 2040 Comprehensive Plan the City expected 5. The City's Wellhead Protection Plan was <br /> additions of 1,227 households,3,200 population,and 853 jobs in these three zones during 2018-2040. <br /> Council staff may recommend a different allocation at the time of the 2050 Plan.We invite City staff to adopted in 2015. A 2021 evaluation of the <br /> contact Met Council to discuss thrs. effect of Well 6 on the DWSMA included <br /> Item 9-Land Use(Emma Dvorak,651-602-1399) reclassifying the entirety of the Lino Lakes <br /> The land uses presented in Scenario 1 appears consistent with the 2040 Comprehensive Plan. DWSMA to Moderate Vulnerability based on <br /> Any <br /> changes to land use.density,of intensity that deviates from the adopted comprehensive plan will require a the latest MDH guidance at that time, which will <br /> Comprehensive Plan Amendment process independent of the AUAR,and will be subject to additional be memorialized in the City's upcoming WHPP <br /> Council review. <br /> update. A statement has been added to the <br /> The land uses outlined in Scenario 2 are inconsistent with the Comprehensive Plan.Scenario 2 will require AUAR regarding Centerville's DWSMA and <br /> a Comprehensive Plan Amendment subject to additional Council review. land use Chokes. <br /> Rem 11-Water Resources,Water Supply(Lanya Ross.651-602-1803) <br /> The Final Technical Memo from WSB to the City of Lino Lakes dated April 28,2025,recognizes the Lino 6. A statement has been added to the water <br /> Lakes Drinking Water Supply Management Area(DWSMA)in the study area.However.the AUAR Update memo (Appendix C) about future wellhead <br /> does not—and should-include information about the 51.Paul Priority A Drinking water SUDDIy <br /> A4 naaement Are that extends into the southern portion of the study area(west of 35E and south of Main DWSMA. <br /> St.)and the Centerville Drinking Water Supply Management Area that also extends across part of the study <br /> area.Different land uses are associated with different potential contaminants(see KIDH Land Cover and 7. A statement has been added to the water <br /> Associated Potential Contaminant Sources surnnvarv}.The memo should also Include how this Information <br /> will be used to guide land use choices and development standards for the study area. memo (Appendix C)for developers to locate <br /> and seal any unlocated wells. This is also noted <br /> The Final Technical Memo from WSB to the City of Lino Lakes dated April 28,2025,notes that a future in the Mitigation Plan as Mitigation Measure <br /> wellrield is preliminarily located within the study area.The memo must acknowledge that this will trigger the 6 <br /> delineation of a new Emergency Response Area and DWSMA around new wells in this wellfield as well as 13.5. <br /> how the consideration of future wellhead protection is being used to proactively guide land use choices and <br /> development standards. 8. A statement has been added to the water <br /> The Final Technical Memo from WSB to the City of Lino Lakes dated April 28,2025,notes several known memo (Appendix C) for aquifer test pumping of <br /> wells in the study area based on the Minnesota Well Index,However,it's important to acknowledge that F new wells when necessary. This is also noted <br /> unreported wells may also exist_The AUAR Update should include a commitment to search for additional in the Mitigation Plan as Mitigation Measure <br /> wells during development and to document and properly seal both known and newly discovered wells. <br /> 13.10. <br /> The AUAR Update does not discuss wells located outside the study area that may be impacted by any new <br /> municipal wells in the proposed new wellfield.The AUAR Update should address what approaches will be 9. Comment noted. <br /> taken to evaluate the potential for and mitigate well interference from future development(including new <br /> water supply infrastructure)in the study area. <br /> The AUAR Update(page 2)and Final Technical Memo from WSB to the City of Lino Lakes dated April 28, <br /> 2025,concludes that planned developed under both scenarios will require Lino Lakes to provide water at a <br /> rate that exceeds their current water appropriation permit limits,and that the ability to adjust those permits <br /> may be impacted by the study area's location within the North and East Groundwater Management Area <br /> and the Ramsey County District Court Order from litigation related to the White Bear Lake water level.The <br /> memo refers to a White Bear Lake Area Comprehensive Plan,which will include water supply alternatives <br /> for the Northeast Metro that could inform water supply options for the study area.That plan is expected to <br /> be complete by June 30,2027-A revision to the AUAR Update may be required to incorporate new water <br /> 8 <br /> Page 197 of 240 <br />