Laserfiche WebLink
Ms.Katie Larsen <br /> 06/04/2025 <br /> Page 5 <br /> • Drainage and Utility Easements <br /> Roadways are proposed within right-of-way and lots include standard drainage and utility <br /> easements. Larger drainage and utility easements will be required to be provided over <br /> any utilities outside the right of way and any surface water management features <br /> Comments: <br /> 1. Provide additional easement for the temporary cul de sac <br /> 2. Provide additional easement for drainage from one property to another <br /> • Development Agreement <br /> A development agreement will be required with the final plat. <br /> • Grading Agreement <br /> Grading agreement not required at this time. <br /> • Stormwater Maintenance Agreement <br /> Private stormwater facilities will be maintained through a Declaration for Maintenance of <br /> Stormwater Facilities. The City of Lino Lakes shall be party to the Declaration. City <br /> Engineer to provide template. <br /> • Permits Required <br /> Required permits may include some of the following and others: <br /> 1. NPDES General Construction Permit <br /> 2. City of Lino Lakes Zoning Permit for Construction <br /> 3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit <br /> 4. Minnesota Department of Health <br /> 5. Rice Creek Watershed District Permit <br /> 6. US Army Corps of Engineers Section 404 Permit <br /> If you or the applicant have any questions regarding these comments, please contact Kris <br /> Keller at(612)419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) <br /> 982-2430 or dhankee@linolakes.us. <br /> Erickson Property Development-Engineering Review <br /> Page 230 of 240 <br />