My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
07-14-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 8:00:30 PM
Creation date
7/11/2025 4:00:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
open water to 20 feet deep. Additional information about groundwater can be found in <br /> Appendix C. <br /> b. Describe effects from project activities on water resources and measures to minimize or <br /> mitigate the effects in Item b.i. through Item b.iv. below. <br /> i. Wastewater— For each of the following, describe the sources, quantities and <br /> composition of all sanitary, municipal/domestic and industrial wastewater <br /> produced or treated at the site. <br /> 1) If the wastewater discharge is to a publicly owned treatment facility, identify <br /> any pretreatment measures and the ability of the facility to handle the added <br /> water and waste loadings, including any effects on, or required expansion of, <br /> municipal wastewater infrastructure. <br /> 2) If the wastewater discharge is to a subsurface sewage treatment systems <br /> (SSTS), describe the system used, the design flow, and suitability of site <br /> conditions for such a system. <br /> 3) If the wastewater discharge is to surface water, identify the wastewater <br /> treatment methods and identify discharge points and proposed effluent <br /> limitations to mitigate impacts. Discuss any effects to surface or groundwater <br /> from wastewater discharges. <br /> Updated analysis on the wastewater system can be found in Appendix D. <br /> ii. Stormwater— Describe the quantity and quality of stormwater runoff at the site <br /> prior to and post construction. Include the routes and receiving water bodies for <br /> runoff from the site (major downstream water bodies as well as the immediate <br /> receiving waters). Discuss any environmental effects from stormwater discharges. <br /> Describe stormwater pollution prevention plans including temporary and <br /> permanent runoff controls and potential BMP site locations to manage or treat <br /> stormwater runoff. Identify specific erosion control, sedimentation control or <br /> stabilization measures to address soil limitations during and after project <br /> construction. <br /> Updated analysis on stormwater can be found in Appendix B. <br /> iii. Water appropriation — Describe if the project proposes to appropriate surface or <br /> groundwater(including dewatering). Describe the source, quantity, duration, use, <br /> and purpose of the water use and if a DNR water appropriation permit is required. <br /> Describe any well abandonment. If connecting to an existing municipal water <br /> supply, identify the wells to be used as a water source and any effects on, or <br /> required expansion of, municipal water infrastructure. Discuss environmental <br /> effects from water appropriation, including an assessment of the water resources <br /> available for appropriation. Identify any measures to avoid, minimize, or mitigate <br /> environmental effects from the water appropriation. <br /> Updated analysis on water system impacts can be found in Appendix C. <br /> 1-35E Corridor AUAR Update <br /> June 6,2025 <br /> Page 7 <br /> Page 63 of 240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.