Laserfiche WebLink
wsb <br /> Final Technical Memorandum <br /> To: Michael Grochala, City of Lino Lakes <br /> From: Henry Meeker, WSB <br /> Alison Harwood, WSB <br /> Date: May 23, 2025 <br /> Re: Stormwater Management— 1-35 Corridor AUAR <br /> City of Lino Lakes, Minnesota <br /> WSB Project No. 027919-000 <br /> INTRODUCTION <br /> The original Alternative Urban Areawide Review (AUAR)was completed and approved in <br /> September 2005. The AUAR analyzed the stormwater impacts of the three development <br /> ° scenarios. Based on the analysis, a Mitigation Plan was developed. <br /> c� <br /> w AUAR updates are required every five years from the original date of the approved AUAR. <br /> co <br /> Updates were prepared in 2010, 2015, and 2020. The 2020 update was made with draft <br /> scenarios of the Lino Lakes 2040 Comprehensive Plan, which was adopted in November 2020. <br /> This AUAR update is based on two development scenarios. It includes mitigation improvements <br /> co <br /> that have been completed at this time and the proposed future land uses. <br /> M The information and analysis outlined within this memo is intended to complete a portion of the <br /> AUAR Update related to Item # 11.ii—Water Resources—Stormwater related to two proposed <br /> development scenarios. This memo is intended to update the stormwater analysis provided in the <br /> original AUAR where applicable. <br /> Z WATER RESOURCES—STORMWATER <br /> ii. Stormwater-Describe the quantity and quality of stormwater runoff at the site prior to <br /> ° and post construction. Include the routes and receiving water bodies for runoff from the <br /> a site (major downstream water bodies as well as the immediate receiving waters). Discuss <br /> W <br /> Z any environmental effects from stormwater discharges. Describe stormwater pollution <br /> prevention plans including temporary and permanent runoff controls and potential BMP <br /> site locations to manage or treat stormwater runoff. Identify specific erosion control, <br /> o sedimentation control or stabilization measures to address soil limitations during and after <br /> LU project construction. <br /> 7) <br /> U) Procedures and Methods Followed <br /> U) The procedures and methods used to estimate the runoff volumes and pollutants loads within the <br /> D AUAR were based on the Natural Resource Conservation Service (NRCS) runoff curve number <br /> w method and event mean concentration pollutant values from the Minnesota Stormwater Manual. <br /> 'a Any development within the study area will be required to meet the stormwater standards of the <br /> a City of Lino Lakes and Rice Creek Watershed District (RCWD). These standards include: <br /> x • Promote volume control and groundwater recharge. <br /> • Protect water quality from nutrients, heavy metals, and other urban pollutants. <br /> M:\027919-000\Admin\Docs\Stormwater\MEMO-021725-Stormwater AP.docx <br /> Page 75 of 240 <br /> z <br />