Laserfiche WebLink
Mr. Michael Grochala <br /> June 12, 2025 <br /> Page 5 <br /> Water Demand Proiection Comparison <br /> Table 5 summarizes the projected average water demands from the 2005 Original AUAR and the <br /> 2025 AUAR Update for the scenarios outlined above. <br /> Table 5. Comparison of Average Water Demand Projections <br /> Scenario 2005 Original 2025 AUAR <br /> AUAR Update <br /> Scenario 1 1.86 MGD 2.43 MGD <br /> Scenario 2 2.45 MGD 2.65 MGD <br /> Scenario 3 2.61 MGD N/A <br /> The projected water demands have remained within the parameters discussed in the original <br /> AUAR. The expansion and layout of the water supply system will generally conform to the layout <br /> identified in the 2005 Original AUAR. The 2005 Original AUAR identified the need for 1.0 MG of <br /> additional storage, approximately four additional wells, and trunk and lateral watermains. Water <br /> Tower No. 3 (1.5 MG)was constructed in 2021, and this AUAR Update reiterates the need for <br /> four to five additional wells. Computer modeling completed as part of the City's 2040 <br /> Comprehensive Plan Update confirmed the adequacy of the planned 16-inch trunk watermain <br /> loop. <br /> M:\027919-000Wdmin\Docs\Water Wastewater\MEMO Water 2025-06-02.docx <br /> Page 86 of 240 <br />