Laserfiche WebLink
Mr. Michael Grochala <br /> April 28, 2025 <br /> Page 6 <br /> Review and Update of the Mitigation Plan <br /> The table below provides the mitigation plan for wastewater management. These mitigation measures have been reviewed and revised as <br /> needed for this AUAR Update. <br /> Table 12. Water Quality: Wastewater <br /> Item No. Mitigation Description Update <br /> 18.1 Monitor wastewater flows and not permit new development to proceed if it This mitigation measure is ongoing. <br /> exceeds the capacity of the wastewater system. <br /> 18.2 Construct the major infrastructure improvements needed to expand the This mitigation measure is ongoing. <br /> capacity of the wastewater system (i.e. lift stations, force mains, and <br /> upgrades to the existing systems) in accordance with the Comprehensive <br /> Sanitary Sewer Plan and Capital Improvement Plan. <br /> 18.3 Adequately phase capacity improvements. This mitigation measure is ongoing. <br /> 18.4 Amend the Comprehensive Sanitary Sewer Plan and Capital Improvement This mitigation measure is ongoing. No <br /> Plan to be consistent with any amendments to the Comprehensive Plan updates have been needed to date for the <br /> that would necessitate expansions or alterations to the sanitary sewer study area. <br /> system and regional capacity needs. <br /> 18.5 Each proposed development will be required to provide a detailed This mitigation measure is ongoing. <br /> projection of wastewater generation and flows. These calculations will be <br /> checked by the City's Engineering Consultant. <br /> 18.6 The City will create a year-end report to evaluate wastewater increases by This mitigation measure is ongoing. <br /> major sewer lines and overall system usage in relation to capacity. Results <br /> of this assessment will become the targets for growth for the following year. <br /> M:\027919-000\Admin\Docs\Water Wastewater\MEMO Wastewater 2025-02-14 Scenario 3 removed.docx <br /> Page 95 of 240 <br />