Laserfiche WebLink
Queuing and Blocking Report <br />Intersection: 17: Access H & Pine Street <br />Movement <br />WEEM, <br />Directions Served <br />LT LR <br />Maximum Queue (ft) <br />11 70 <br />Average Queue (ft) <br />1 38 <br />95th Queue (ft) <br />7 60 <br />Link Distance (ft) <br />2985 947 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Zone Summary <br />Zone wide Queuing Penalty: 204 <br />Build Scenario 1 (2045) - AM Peak Hour Main Street Corridor Development - Lino Lakes, MN <br />Kimley-Horn and Associates, Inc. <br />06/26/2025 <br />SimTraffic Report <br />Page 7 <br />Page 338 of 617 <br />