Laserfiche WebLink
2045 PM Peak <br />50% Confidence Level <br />Daylight conditions <br />Project: Lino Lakes NW / Main Street Development <br />Scheme: Lake & Main - Expanded Roundabout S 1 <br />Rodel-Winl - Full Geometry <br />Global Results <br />Performance and Accidents <br />2045 PM Peak Global Performance <br />Parameter <br />Units <br />Entries <br />2804 <br />Bypasses <br />290 <br />Total <br />3094 <br />Arrive Flows veh/hr <br />Capacity <br />veh/hr <br />3781 <br />829 <br />4610 <br />Average Delay <br />sec/veh <br />20.87 <br />6.61 <br />19.53 <br />L.O.S. (Signal) <br />A— F <br />C <br />A <br />B <br />L.O.S.(Unsig) <br />A—F <br />C <br />A <br />C <br />Total Delay <br />veh.hrs <br />16.25 <br />0.53 <br />16.79 <br />Report dated 29-Apr-2025 Page 2 of 2 <br />Rodel Version 1.96 Run number 36 <br />Page 453 of 617 <br />