Laserfiche WebLink
2025 PM Peak <br />50% Confidence Level <br />Daylight conditions <br />Project: Lino Lakes NW / Main Street Development <br />Scheme: Main Street & Sunset Ave - Existing (2025) Conditions <br />Rodel-Winl - Full Geometry <br />Operational Results <br />2025 PM Peak - 60 minutes <br />Flows and Capacity <br />Bypass <br />Leg <br />Leg Names <br />Type <br />1 <br />Sunset Ave EB <br />None <br />2 <br />Main St NB <br />None <br />3 <br />Main St WB <br />None <br />Flows (veh/hr) <br />Arrival Flow Opposing Flow Exit <br />Entry Bypass Entry Bypass Flow <br />510 39 583 <br />193 362 187 <br />485 137 418 <br />Delays, Queues and Level of Service <br />Bypass <br />Average Delay (sec) <br />Leg <br />Leg Names <br />Type <br />Entry Bypass <br />Leg <br />1 <br />Sunset Ave EB <br />None <br />5.19 <br />5.19 <br />2 <br />Main St NB <br />None <br />4.32 <br />4.32 <br />3 <br />Main St WB <br />None <br />5.34 <br />5.34 <br />Capacity (veh/hr) <br />Capacity Average VCR <br />Entry Bypass Entry Bypass <br />1173 <br />0.4346 <br />1000 <br />0.1930 <br />1130 <br />0.4292 <br />95% Queue (veh) <br />Entry Bypass <br />2.05 <br />0.65 <br />2.01 <br />Level of Service <br />Entry Bypass Leg <br />A A <br />A A <br />A A <br />Report dated 24-Apr-2025 Page 1 of 2 <br />Rodel Version 1.96 Run number42 <br />Page 460 of 617 <br />