Laserfiche WebLink
2045 PM Peak <br />50% Confidence Level <br />Daylight conditions <br />Project: Main Street Northwest <br />Scheme: Sunset & Lilac - 2045 Scenario 1 <br />Rodel-Winl - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names <br />1 Sunset Ave SB <br />2 Lilac St NB <br />3 Sunset Ave W B <br />Flows (veh/hr) <br />Capacity (veh/hr) <br />Bypass <br />Type <br />Arrival Flow <br />Opposing Flow <br />pp g <br />Exit <br />Capacity Average VCR <br />p Y g <br />Entry Bypass <br />Entry Bypass <br />Flow <br />Entry <br />Bypass Entry Bypass <br />None <br />577 <br />100 <br />822 <br />1111 <br />0.5193 <br />None <br />815 <br />119 <br />558 <br />1101 <br />0.7403 <br />None <br />224 <br />698 <br />236 <br />792 <br />0.2829 <br />Delays, Queues and Level of Service <br />Bypass <br />Average Delay (sec) <br />Leg <br />Leg Names <br />Type <br />Entry Bypass <br />Leg <br />1 <br />Sunset Ave SB <br />None <br />6.39 <br />6.39 <br />2 <br />Lilac St NB <br />None <br />11.42 <br />11.42 <br />3 <br />Sunset Ave W B <br />None <br />6.10 <br />6.10 <br />95% Queue (veh) <br />Entry Bypass <br />2.99 <br />7.85 <br />1.13 <br />Level of Service <br />Entry Bypass Leg <br />A A <br />B B <br />A A <br />Report dated 25-Apr-2025 Page 1 of 2 <br />Rodel Version 1.96 Run number 71 <br />Page 512 of 617 <br />