Laserfiche WebLink
Access locations shown are <br />preliminary and subject to change. <br />Because Main Street is a Principal <br />Arterial, the proposed access <br />locations do not conform to the <br />Do these accesses meet Anoka County intersection spacing guidelines? <br />County's Access Spacing <br />Guidelines but are generally <br />consistent with the existing access <br />conditions along Main Street. The <br />final locations of access points will <br />be coordinated with the county. <br />Checks were performed on all <br />tables. Some corrections were <br />made to reported LOS and delay. <br />Check LOS grades <br />Note that worst movement delay <br />is reported at side street stop <br />controlled intersections instead of <br />overall delay. <br />Yes, congestion and lack of gaps <br />along Main Street is anticipated to <br />represent an issue for right turning <br />Does expanding Main St. to 4 lanes significantly improve operations for NB side street approach? <br />vehicles if Main Street were to <br />remain a two-lane road under <br />buildout conditions. Expanding <br />Main Street to four -lanes removes <br />this issue. <br />Where is info for Main St & Access D? <br />Added results for Main Street & <br />Access D to the table. <br />Page 546 of 617 <br />