My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction emissions for the two proposed scenarios are based on length of construction33 <br />and are from mobile equipment, including passenger cars, light -duty trucks, and medium and <br />heavy-duty trucks, and construction equipment (both gasoline and diesel). <br />Existing emissions during operations (full build out of either scenario) include natural gas <br />(stationary equipment) for heating buildings and water, on -site generator testing, use of off - <br />site electricity, and off -site waste management. Emissions from cooling and refrigeration <br />systems are not accounted for in this analysis as GHGs from refrigerants are approximately <br />less than 5 percent of the total GHG emissions of a building.31 <br />Table 11: Construction Emissions <br />Table 12: Operational Emissions <br />b. GHG Assessment <br />Describe any mitigation considered to reduce the project's GHG emissions. <br />In both Scenario 1 and Scenario 2, the following are potential design strategies and <br />sustainability measures that could be taken into consideration for future development <br />to reduce emissions: <br />33 Total construction duration of the site is estimated to be completed over 6 to 8 construction seasons, over 30+ <br />years. <br />34 Source: https://practicegreenhealth.org/sites/default/files/2019-06/PracticeGreenhealth GHG Toolkit 0.pdf <br />35 Emissions are categorized as either direct or indirect. Scope 1 emissions are direct emissions that are released <br />directly from properties owned or under the control of the project proposer. This includes, for example, the use of <br />mobile equipment during construction. Scope 2 and 3 emissions are indirect emissions. Scope 2 emissions are <br />associated with the offsite generation of purchased electricity and/or steam. Scope 3 emissions are from the offsite <br />provision of waste management services, including land disposal (landfilling), recycling, and solid waste composting. <br />Lino Lakes Main Street - AUAR 70 July 2025 <br />Page 78 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.