My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mill rit SM. troTilir- <br />Scenario 1 and 2: Provide construction oversight to ensure designed sediment <br />and erosion control measures are being implemented. <br />Scenario 1 and 2: Future developers would complete a geotechnical report that <br />would provide recommendations for structural and foundation design based on the <br />soil types in the study area. <br />Scenario 1 and 2: If any potential impacts are proposed to <br />FEMA 100-Year Floodplains as part of development within the <br />AUAR study area, the applicable City of Lino Lakes and RCWD <br />approvals will be obtained. Note: RCWD approvals are required <br />Floodplains <br />specifically to RCWD's 1 00-ear floodplains. <br />Scenario 1 and 2: Floodplain alterations will require submittal of <br />appropriate Letter of Map Change to FEMA to document <br />changes to floodplain boundaries. <br />Scenario 1 and 2: Delineate wetlands in accordance with the <br />Army Corps of Engineers Wetlands Delineation Manual and <br />classify wetlands according to Wetlands of the United States <br />(Circular 39) and Wetlands and Deepwater Habitats of the <br />United States. <br />Scenario 1 and 2: Follow sequencing process of wetland <br />Wetlands <br />avoidance, minimization, rectification, and mitigation as outlined <br />in the Wetland Conservation Act (WCA) if wetlands area altered. <br />If any potential impacts are proposed to regulated wetlands as <br />part of development within the AUAR study area, the applicable <br />City of Lino Lakes, WCA, RCWD, and USACE permits will be <br />obtained. <br />Scenario 1 and 2: Required wetland buffers will be <br />incorporated into site design. <br />Scenario 1 and 2: Realignment of the ACD system 10-22-32 is <br />proposed in both scenarios. A 20-foot buffer will be maintained <br />Water <br />on each side of the ditch as required by RCWD to allow for <br />Resources <br />Ditches <br />regular maintenance. Lino Lakes proposes an average buffer <br />width of 50 feet on either side to provide space for the greenway <br />corridor creation. The buffer zone will be clear of obstructions <br />such as trees and buildings. <br />Scenario 1 and 2: Stormwater BMPs will be constructed in <br />accordance with City, RCWD, and MIDS requirements as the <br />property is developed. <br />Scenario 1 and 2: Developers are encouraged to use best <br />practices to reduce chloride use in snow and ice removal. <br />Scenario 1 and 2: During construction, erosion and sediment <br />control BMPs will be implemented and maintained to prevent <br />Stormwater <br />impacts to aquatic ecosystems. <br />Scenario 1 and 2: Require stormwater management systems to <br />be developed in accordance with the current version of the Rice <br />Creek Watershed District Rules and Chapter 1011 of City Code, <br />as amended. <br />Lino Lakes Main Street - AUAR 80 July 2025 <br />Page 88 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.