Laserfiche WebLink
discussed at the beginning of the project and reiterated through the process, it was not the <br />purpose of the plan to modify densities within the project area. That would be a consideration <br />for review with City-wide land use and density during the 2050 Comprehensive Plan update <br />starting in 2027. The plan establishes the framework and guidelines for future development. <br />Updated water and sanitary sewer system planshave been incorporated into the final draft and <br />address routing and sizing requirements based on the preferred scenario. A phasing plan has <br />been included that generally outlines a development sequence based on the orderly extension <br />of utilities and land area included in the 2040 Comprehensive Plan Utility Staging areas. The <br />phasing boundaries as currently shown should be considered flexible and are not intended to <br />be fixed at this time. Staff anticipates some modification as part of any amendment to the <br />Comprehensive Plan Utility Staging Plan. <br />A public hearing on the Master Plan is scheduled for tonight’s meeting. Pending consideration <br />and recommendation by the Board, the Master Plan would be placed on the August 25, 2025, <br />regular Council meeting for adoption. If approved,staff would begin the process for <br />amendment of the 2040 Comprehensive Plan to incorporate the Master Plan. <br /> <br />RECOMMENDATION <br />Staff is requesting a recommendation for approval of the Lino Lakes Main Street Master Plan. <br />ATTACHMENTS <br />1.Draft Lino Lakes Main Street Master Plan <br />2 <br /> <br />