My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
08/13/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 1:20:46 PM
Creation date
8/8/2025 1:20:32 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.Confirm wetland outlets are above the HWL for the wetlands and will not affect <br />hydrology during final design. <br />13.The Andall St connection should have the minimum width as derived from the <br />traffic studyand allowed by city ordinanceto allow for emergency servicesand <br />public street connection.Reduction of the road width will preserve wetlands and <br />trees through the corridor. <br />a.Trail connections should be provided along with water stubs for fire <br />prevention. <br />b.This will be evaluated as final design of the roadway is staked. <br />14.Tree removal should be completed in the fall or winter to minimize impacts to <br />migrating or nesting bat populations <br />15.Provide a Blandings turtle mitigation plan, surmountable curb is provided to <br />allow turtles access off of the roads. <br />16.Submit the approved MN DNR Take Permit <br />Page 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.