Laserfiche WebLink
Ms. Katie Larsen <br />08/06/2025 <br />Page 7 <br />(WSB 8/6/2025) Confirm same criteria are met for new proposed storm sewer <br />alignment connecting to Anoka County storm sewer. <br />22. (WSB 8/6/2025) The City outfall for the Marketplace Dr storm sewer was shifted 8’ <br />east during construction to better align with ditch grading. The outlet for BMP IB-2 <br />should be shifted ~2’ east accordingly to daylight in a similar fashion. <br /> <br /> <br /> <br /> Water Supply <br /> <br />Existing and proposed water services are provided for the 3 commercial lots through <br />existing and proposed City infrastructure on Lake Drive (CSAH 23) and the future Market <br />Place Drive. <br /> <br />Comments: <br />1. Coordinate with the City 2025 Market Place Drive Realignment Project for providing <br />the appropriately sized stubs at the appropriate locations <br />(DTE 3/11/2025) The latest design file provided by the City has been included in the <br />plans. <br />(WSB 4/2/2025) See comments and as-bid plans <br />(WSB 5/7/2025) City to provide two sets of utility stubs (6” PVC C900 water and 4” <br />PVC sanitary sewer with gate valves roughly at the easement line) <br />(DTE 6/19/2025) Plans have been updated with the 2025 Market Place Drive <br />Realignment Project plans. <br />(WSB 8/6/2025) Complete <br />2. Verify that the proposed 6” water stubs are sufficient for the building’s combined <br />domestic and fire suppression needs. <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete <br />3. We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan for water supply and hydrant coverage. <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Current version to be reviewed <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025)Personnel from the Fire Division provided comments on hydrant <br />locations, and the requested hydrants have been added to the plans. <br />(WSB 8/6/2025) Complete <br />4. Show removing all watermain up to the gate valve and the hydrant assembly along <br />th <br />the current 77 Street <br />(DTE 3/11/2025) The plans have been revised to include removal of the watermain <br />and hydrant by the City as that is shown in the Marketplace Dr plans. <br />(WSB 4/2/2025) City will remove the hydrant assembly but the watermain shall be <br />removed up to but NOT including the existing gate valve. Plug gate valve for <br />redundancy <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) The watermain listed in the comment has been marked for removal. <br />(WSB 8/6/2025) Complete <br />5. Building A will utilize the existing 6” water service stub instead of installing a new <br />service tee on the main <br />Java Properties - Lino Retail 2.0 Engineering Review <br /> <br />