Laserfiche WebLink
Final Plat <br />The final plat contains the following lots and outlots: <br />Lot or Outlot Purpose Ownership <br />Lots Single family villa homes Private <br />A Open spaceand wetlands HOA <br />B Future developmentPrivate <br />C Open space HOA <br />Open space, wetlands, stormwater <br />D HOA <br />ponds, trail corridor <br />E Lift stationCity <br />F Future developmentPrivate <br />Open space, stormwater ponds, trail <br />G HOA <br />corridor <br />Phasing Plan <br />The development is proposed to be constructed in two (2) phases. <br />Phase # Lots <br />1 45 <br />2 49 <br />Total94 <br />Public Land Dedication <br />The City will collect cash fee in lieu of land dedication and provide credit for trail construction <br />costs. The following is a summary: <br />Natures Refuge North 1st Addition <br />Total # Units =45 <br />x Park Dedication Fee$3,500 <br />= Cash in Lieu Value$157,500 <br />(Trail Construction Costs) ($46,920) <br />3 <br /> <br />