My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
08/13/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 1:20:46 PM
Creation date
8/8/2025 1:20:32 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. City EngineerMemo dated August 6, 2025 <br />Memorandum <br />To:Eric Zweber, WSB <br />Cc:Katie Larsen, Lino Lakes City Planner <br />From:Kris KellerPE, WSB <br />Diane HankeePE, Lino LakesCity Engineer <br />Date:August 6, 2025 <br />Re:Natures Refuge North - Preliminary Plat <br />st <br />Addition - Final Plat <br />Natures Refuge North 1 <br />EngineeringReview - 023898-000 <br />WSB’sreviewofthe Preliminary Plat submittalfor the Natures Refuge North developmentand <br />st <br />Addition in Lino Lakes, MN, prepared by <br />the Final Plat submittal for Natures Refuge North 1 <br />Carlson and receivedJuly 9, 2025. Our comments were made on the following documents: <br />Natures Refuge North Plansprepared by Carlson, dated June 26, 2025. <br />Lift Station information, receivedJuly 18, 2025. <br />The following review comments should be responded to in writing by the applicant. There are <br />additional redline comments on the plan set that should be responded to as well. Not all redline <br />comments are in the review memo. <br />Carlson (4/25/2025) responses in red. <br />WSB (5/23/2025) responses and new comments in blue. <br />Carlson (6/6/2025) responses in orange. <br />WSB (6/25/2025) responses and new comments in green. <br />WSB (8/6/2025) responses and new comments in purple. <br />Engineering <br />• General <br /> <br />The Natures Refuge North Addition is the second phase of the overall Natures Refuge <br />development which includes 60 acres north ofCSAH 14 (Main Street), west ofCSAH 23 <br />(LakeStreet) and east of Wood Duck Trail. Thecurrent conceptual project proposes 92villa <br />lots and associated infrastructure. This property was originally part of a larger development <br />of which an Environmental Assessment Worksheet (EAW) was prepared. The evaluation <br />concluded that the project did not have the potential for significant environmental effects. <br />• Grading <br /> <br />The Natures Refuge North Addition includessite grading forthe 92unitsas well as <br />extensions of Haywood Drive and three local streets that are yet to be named. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.