Laserfiche WebLink
<br />Northwest Main – Lino Lakes, MN <br />Traffic Impact Analysis │ June 2025 <br />36 <br /> <br />• Install side street stop control at all access points along 4th Avenue and Pine Street. <br />• Install southbound right turn lanes at access points along 4th Avenue south of Main Street (i.e., <br />Access E). <br />• Install northbound left turn lanes at access points on 4th Avenue north of Main Street (Access F and <br />Access G). <br />• Expand Main Street to a four-lane road west of Lake Drive <br />o Includes expanding roundabouts at Sunset Avenue and Access C to 2x1 roundabouts. <br />• Install a 2x1 roundabout at Main Street & 4th Avenue <br />• Expand Main Street & Lake Drive roundabout to accommodate northbound left-turn traffic. <br />o The roundabout is anticipated to require two northbound entry lanes, two exit lanes on <br />the west leg, and a bypass lane for the eastbound approach <br />Note that it is anticipated that the full development of the AUAR area would take up to 30 years. However, <br />traffic projections as part of an AUAR are typically 20-year analysis horizon. This results in a conservative <br />analysis for the Design Year as the full site may not be built out yet. All traffic mitigation should be updated <br />when the AUAR is updated. <br /> <br />Page 217 of 679