Laserfiche WebLink
Queuing and Blocking Report <br />04/28/2025 <br />Build Scenario 2 (2030) - PM Peak Hour Main Street Corridor Development - Lino Lakes, MN SimTraffic Report <br />Kimley-Horn and Associates, Inc.Page 3 <br />Intersection: 2: CR 53 (Sunset Avenue) & Robinson Drive <br />Movement WB <br />Directions Served R <br />Maximum Queue (ft)52 <br />Average Queue (ft)19 <br />95th Queue (ft)39 <br />Link Distance (ft)1079 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 3: CR 53 (Sunset Avenue) & Century Trail <br />Movement WB <br />Directions Served R <br />Maximum Queue (ft)49 <br />Average Queue (ft)22 <br />95th Queue (ft)37 <br />Link Distance (ft)576 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 5: 4th Avenue & Pine Street <br />Movement WB NB SB <br />Directions Served LTR LTR LTR <br />Maximum Queue (ft)6 35 44 <br />Average Queue (ft)0 19 4 <br />95th Queue (ft)6 39 26 <br />Link Distance (ft)7093 1882 728 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Page 394 of 679