Laserfiche WebLink
Queuing and Blocking Report <br />04/29/2025 <br />Build Scenario 2 (2045) MITIGATED - AM Peak Hour Main Street Corridor Development - Lino Lakes, MN SimTraffic Report <br />Kimley-Horn and Associates, Inc.Page 6 <br />Intersection: 16: 4th Avenue & Access G <br />Movement EB NB <br />Directions Served LR LT <br />Maximum Queue (ft)70 38 <br />Average Queue (ft)39 3 <br />95th Queue (ft)59 19 <br />Link Distance (ft)1130 1885 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 17: Access H & Pine Street <br />Movement WB NB <br />Directions Served LT LR <br />Maximum Queue (ft)6 73 <br />Average Queue (ft)0 32 <br />95th Queue (ft)0 56 <br />Link Distance (ft)2985 947 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Zone Summary <br />Zone wide Queuing Penalty: 0 <br />Page 409 of 679