Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & 4th Ave - 2045 Scenario 1 Mitigation <br />Run number 43 <br />Project: Main Street Northwest2045 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 4th Ave SB None 322 939 507 806 0.3993 <br />2 Main St EB None 958 219 1042 2158 0.4439 <br />3 4th Ave NB None 261 969 208 795 0.3283 <br />4 Main St WB None 990 456 774 1905 0.5198 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 4th Ave SB None 7.11 7.11 1.82 A A <br />2 Main St EB None 3.80 3.80 2.81 A A <br />3 4th Ave NB None 6.48 6.48 1.34 A A <br />4 Main St WB None 4.38 4.38 3.41 A A <br />Page 424 of 679