Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & 4th Ave - 2045 Scenario 2 Mitigation <br />Run number 51 <br />Project: Main Street Northwest2045 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 4th Ave SB None 227 965 358 797 0.2850 <br />2 Main St EB None 842 188 1004 2191 0.3843 <br />3 4th Ave NB None 235 848 182 841 0.2794 <br />4 Main St WB None 993 330 753 2039 0.4869 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 4th Ave SB None 6.09 6.09 1.09 A A <br />2 Main St EB None 3.05 3.05 1.99 A A <br />3 4th Ave NB None 5.73 5.73 1.06 A A <br />4 Main St WB None 3.69 3.69 2.87 A A <br />Page 428 of 679