Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C - 2030 Scenario 1 <br />Run number 12 <br />Project: Main Street Northwest2030 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 137 446 43 929 0.1475 <br />2 Main St EB None 472 127 456 1097 0.4301 <br />3 Access C NB None 149 556 43 871 0.1711 <br />4 Main St WB None 341 148 557 1086 0.3139 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 4.41 4.41 0.62 A A <br />2 Main St EB None 5.60 5.60 2.90 A A <br />3 Access C NB None 4.86 4.86 0.77 A A <br />4 Main St WB None 4.67 4.67 1.66 A A <br />Page 430 of 679