Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C - 2030 Scenario 1 <br />Run number 15 <br />Project: Main Street Northwest2030 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 107 804 140 740 0.1446 <br />2 Main St EB None 666 174 737 1073 0.6209 <br />3 Access C NB None 115 700 140 795 0.1447 <br />4 Main St WB None 760 184 631 1067 0.7121 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 5.51 5.51 0.47 A A <br />2 Main St EB None 8.28 8.28 4.30 A A <br />3 Access C NB None 5.13 5.13 0.46 A A <br />4 Main St WB None 10.71 10.71 6.37 B B <br />Page 432 of 679