Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C - 2030 Scenario 2 <br />Run number 18 <br />Project: Main Street Northwest2030 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 80 400 26 953 0.0839 <br />2 Main St EB None 495 89 391 1117 0.4430 <br />3 Access C NB None 103 545 39 877 0.1175 <br />4 Main St WB None 342 84 564 1120 0.3053 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 3.99 3.99 0.32 A A <br />2 Main St EB None 5.62 5.62 3.05 A A <br />3 Access C NB None 4.52 4.52 0.49 A A <br />4 Main St WB None 4.46 4.46 1.56 A A <br />Page 434 of 679