Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C - 2030 Scenario 2 <br />Run number 21 <br />Project: Main Street Northwest2030 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 62 778 84 754 0.0823 <br />2 Main St EB None 615 133 707 1094 0.5620 <br />3 Access C NB None 80 622 126 836 0.0957 <br />4 Main St WB None 760 102 600 1111 0.6843 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 5.05 5.05 0.25 A A <br />2 Main St EB None 7.09 7.09 3.39 A A <br />3 Access C NB None 4.63 4.63 0.29 A A <br />4 Main St WB None 9.47 9.47 5.60 A A <br />Page 436 of 679