Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C - 2045 Scenario 1 <br />Run number 28 <br />Project: Main Street Northwest2045 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 140 1118 210 574 0.2438 <br />2 Main St EB None 1216 191 1067 1064 1.1431 <br />3 Access C NB None 206 1058 197 606 0.3399 <br />4 Main St WB None 1058 347 917 981 1.0781 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 7.98 7.98 0.86 A A <br />2 Main St EB None 265.63 265.63 303.66 F F <br />3 Access C NB None 8.64 8.64 1.37 A A <br />4 Main St WB None 159.55 159.55 151.37 F F <br />Page 440 of 679