Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C - 2045 Scenario 2 <br />Run number 31 <br />Project: Main Street Northwest2045 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 148 695 71 797 0.1856 <br />2 Main St EB None 699 127 716 1097 0.6369 <br />3 Access C NB None 237 749 76 769 0.3081 <br />4 Main St WB None 540 227 759 1045 0.5169 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 5.45 5.45 0.90 A A <br />2 Main St EB None 9.33 9.33 8.51 A A <br />3 Access C NB None 6.78 6.78 1.94 A A <br />4 Main St WB None 7.09 7.09 4.56 A A <br />Page 442 of 679