Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C - 2045 Scenario 2 <br />Run number 34 <br />Project: Main Street Northwest2045 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 110 1069 218 600 0.1833 <br />2 Main St EB None 1038 182 996 1068 0.9717 <br />3 Access C NB None 176 974 234 650 0.2708 <br />4 Main St WB None 1027 283 867 1015 1.0119 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 7.08 7.08 0.61 A A <br />2 Main St EB None 48.57 48.57 37.52 E E <br />3 Access C NB None 7.30 7.30 1.02 A A <br />4 Main St WB None 77.25 77.25 60.69 F F <br />Page 444 of 679