My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-11-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-11-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 8:42:09 AM
Creation date
8/12/2025 8:25:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/11/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Lino Lakes Main Street - AUAR 15 August 2025 <br />Resource <br />Category Climate Considerations <br />Project Information <br />Climate Change <br />Risks and <br />Vulnerabilities <br />Adaptations <br />(Scenario 1 and Scenario 2) <br />Land Use No critical facilities (i.e., <br />facilities necessary for <br />public health and safety, <br />those storing hazardous <br />materials, or those with <br />housing occupants who <br />may be insufficiently <br />mobile) are proposed. A <br />portion of the study area <br />is located in a FEMA flood <br />zone, where there is a 1% <br />annual chance of flooding <br />and a 26% chance of <br />flooding over a 30-year <br />period (FEMA Zone A). <br />More details on flood <br />areas and risks are <br />provided in Items 10: <br />Land Use and 12: Water <br />Resources. <br />A portion of the <br />proposed <br />development is in <br />an area with a risk <br />of flooding. <br />• Future design of the study area <br />and associated stormwater <br />management facilities will be <br />completed to reduce the risk of <br />flooding in the AUAR study <br />area. Buildings will be set at <br />elevations to maintain <br />clearance above 100-year <br />flood elevations. Infiltration <br />areas, such as native <br />landscaping, may be used and <br />would improve water quality <br />and stormwater runoff in the <br />project vicinity. Stormwater <br />and Floodplain Mitigation items <br />are detailed in Item 12: Water <br />Resources. <br />Page 45 of 679
The URL can be used to link to this page
Your browser does not support the video tag.