Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Access C (2x1) - 2045 Scenario 2 <br />Run number 54 <br />Project: Main Street Northwest2045 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Access C SB None 140 1143 221 729 0.1921 <br />2 Main St EB None 1038 162 1121 2219 0.4678 <br />3 Access C NB None 206 962 238 798 0.2583 <br />4 Main St WB None 1027 337 831 2032 0.5054 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Access C SB None 5.92 5.92 0.66 A A <br />2 Main St EB None 3.42 3.42 2.75 A A <br />3 Access C NB None 5.87 5.87 0.95 A A <br />4 Main St WB None 3.86 3.86 3.10 A A <br />Page 452 of 679