Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Lake & Main - Expanded Roundabout S1 <br />Run number 33 <br />Project: Lino Lakes NW / Main Street Development2045 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Main St EB Yield 504 325 618 618 456 814 752 0.6189 0.4321 <br />2 Lake Dr NB None 372 517 929 1251 0.2973 <br />3 Main St WB None 503 456 433 1047 0.4806 <br />4 Lake Dr SB None 451 623 336 825 0.5466 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Main St EB Yield 17.18 9.79 14.28 16.55 4.83 C A B <br />2 Lake Dr NB None 6.11 6.11 2.85 A A <br />3 Main St WB None 7.82 7.82 5.31 A A <br />4 Lake Dr SB None 9.54 9.54 6.46 A A <br />Page 478 of 679