Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Lake & Main - Expanded Roundabout S1 <br />Run number 36 <br />Project: Lino Lakes NW / Main Street Development2045 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Main St EB Yield 503 290 504 504 1047 901 829 0.5582 0.3498 <br />2 Lake Dr NB None 1158 533 764 1315 0.8803 <br />3 Main St WB None 674 1076 611 810 0.8317 <br />4 Lake Dr SB None 469 1083 665 754 0.6221 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Main St EB Yield 8.52 6.61 7.82 3.39 1.50 A A A <br />2 Lake Dr NB None 27.65 27.65 24.68 D D <br />3 Main St WB None 24.79 24.79 13.53 C C <br />4 Lake Dr SB None 11.74 11.74 4.45 B B <br />Page 480 of 679