Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Lake & Main - Expanded Roundabout S2 <br />Run number 42 <br />Project: Lino Lakes NW / Main Street Development2045 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Main St EB Yield 506 330 619 619 458 814 752 0.6218 0.4390 <br />2 Lake Dr NB None 375 519 935 1249 0.3001 <br />3 Main St WB None 503 459 435 1045 0.4811 <br />4 Lake Dr SB None 452 625 337 824 0.5483 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Main St EB Yield 17.50 9.99 14.53 17.01 5.05 C A B <br />2 Lake Dr NB None 6.18 6.18 2.91 A A <br />3 Main St WB None 7.85 7.85 5.34 A A <br />4 Lake Dr SB None 9.60 9.60 6.53 A A <br />Page 482 of 679