Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Lake & Main - Expanded Roundabout S2 <br />Run number 45 <br />Project: Lino Lakes NW / Main Street Development2045 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Main St EB Yield 505 294 505 505 1050 901 828 0.5608 0.3549 <br />2 Lake Dr NB None 1160 535 769 1314 0.8831 <br />3 Main St WB None 675 1079 612 809 0.8343 <br />4 Lake Dr SB None 470 1086 666 753 0.6244 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Main St EB Yield 8.57 6.67 7.87 3.42 1.54 A A A <br />2 Lake Dr NB None 28.18 28.18 25.19 D D <br />3 Main St WB None 25.11 25.11 13.72 D D <br />4 Lake Dr SB None 11.82 11.82 4.49 B B <br />Page 484 of 679