Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Sunset Avenue 2030 Scenario 1 <br />Run number 88 <br />Project: Lino Lakes Northwest / Main Street Development2030 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Sunset Ave SB None 63 697 29 819 0.0769 <br />2 Main St EB None 645 263 498 1051 0.6136 <br />3 Sunset Ave NB None 296 421 485 980 0.3021 <br />4 Main St WB None 470 257 460 1005 0.4675 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Sunset Ave SB None 4.65 4.65 0.31 A A <br />2 Main St EB None 9.25 9.25 7.90 A A <br />3 Sunset Ave NB None 5.13 5.13 1.66 A A <br />4 Main St WB None 6.27 6.27 3.37 A A <br />Page 494 of 679