Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Sunset Avenue 2030 Scenario 1 <br />Run number 91 <br />Project: Lino Lakes Northwest / Main Street Development2030 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Sunset Ave SB None 49 915 84 711 0.0689 <br />2 Main St EB None 794 189 775 1093 0.7266 <br />3 Sunset Ave NB None 392 612 371 879 0.4462 <br />4 Main St WB None 695 304 700 1040 0.6683 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Sunset Ave SB None 5.27 5.27 0.23 A A <br />2 Main St EB None 11.11 11.11 8.42 B B <br />3 Sunset Ave NB None 7.07 7.07 2.51 A A <br />4 Main St WB None 9.75 9.75 6.38 A A <br />Page 496 of 679