Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Sunset Avenue 2030 Scenario 2 <br />Run number 97 <br />Project: Lino Lakes Northwest / Main Street Development2030 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Sunset Ave SB None 206 601 82 871 0.2364 <br />2 Main St EB None 644 309 498 1027 0.6270 <br />3 Sunset Ave NB None 288 466 485 956 0.3012 <br />4 Main St WB None 402 281 473 993 0.4047 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Sunset Ave SB None 5.31 5.31 1.21 A A <br />2 Main St EB None 10.00 10.00 8.81 A A <br />3 Sunset Ave NB None 5.27 5.27 1.67 A A <br />4 Main St WB None 5.67 5.67 2.53 A A <br />Page 498 of 679