Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & Sunset Avenue 2030 Scenario 2 <br />Run number 100 <br />Project: Lino Lakes Northwest / Main Street Development2030 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Sunset Ave SB None 160 840 259 751 0.2131 <br />2 Main St EB None 795 224 776 1074 0.7402 <br />3 Sunset Ave NB None 397 648 371 859 0.4619 <br />4 Main St WB None 685 414 631 981 0.6985 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Sunset Ave SB None 5.88 5.88 0.84 A A <br />2 Main St EB None 11.87 11.87 9.13 B B <br />3 Sunset Ave NB None 7.43 7.43 2.70 A A <br />4 Main St WB None 11.34 11.34 7.57 B B <br />Page 500 of 679